Maksudur Rahman
Maksudur Rahman
Back to Projects
Case Study2022 - 2023

Garments ERP System

A garment production manager tracking raw material supply, dye inventory, sewing line capacity, and shipment milestones.

Role

System Architect

Sector

Manufacturing

pipeline://textile-supply-chain
ProcurementFAB-COT-01IN STORAGE
Dyeing LineTSH-BLU-42IN DYE BATH
ShippingEXP-MUM-08IN TRANSIT
Sockets: ConnectedReconciled items: 2,400

The Challenge

  • Tracking item quantities across multiple sub-assembly stages without lag.
  • Dealing with unpredictable changes in dye and fabric inventory levels.
  • Integrating external logistics tracking data with interior assembly pipelines.

Our Solution

  • Designed a visual Kanban production board powered by web sockets.
  • Created a multi-warehouse inventory module utilizing double-entry inventory patterns.
  • Developed an API connector to sync shipment statuses with international carriers.

Measured Impact

"Improved supply chain visibility, lowering material waste by 18% and cutting production delivery delays."

System Reliability Verified